Bath

Bath RUH

Category

Location

Bath

Contract Period

8 Months

Following a recommendation and successful qualification of a PQQ (pre-qualification questionnaire) to ascertain the suitability of Weaver Demolition as a contractor, we were recently contracted by Bath RUH to deliver a full-service enabling contract to de-contaminate the structure, carry out asbestos removal, and provide safe demolition of redundant hospital buildings, whilst working within a live and highly sensitive hospital environment.

The demolition of buildings spanned a 2-acre site and partition works were carried between remaining live hospital areas and areas to be demolished.

In full, the work involved the strip-out of licensed and non-licenced asbestos, the draining down and purging of all mechanical systems, building soft-strip works, the de-contamination of circa 800 meters of underground service ducts, the removal of basements, service trenches and ducts, and drainage diversion with all mapping, depth and manhole locations identified.

All hardcore arisings were crushed on-site and re-used for the formation of levels and formation of piling mat with CBR testing used check cand approve conformity of compaction.

Structural alterations and openings also had to be considered and led the formation of openings to re-model the hospital’s internal layout, with openings ranging in size from 900mm to over 4m wide.

Weaver Demolition delivered the complete solution to prepare the site to enable the construction of a specialist cancer research unit within the Bath RUH hospital site.

 

 

“I can highly recommend Weaver Demolition. They are a very professional outfit and a pleasure  to work with”

Project Manager, Bath RUH

 

Benefits

Through working with Weaver Demolition, the client benefitted from having:

  • full programme integration
  • a single point of contact for all decontamination, demolition and alteration facilitating works
  • a fully accredited and reputable contractor that understands the importance in delivering best value, programme efficiency and full health & safety, environmental and quality compliance through our ISO accreditations.

 

The project began in September 2020 and took 8 months to complete.

On completion of the project, Weaver Demolition had delivered a construction ready site, free from contamination and underground obstructions. The project was de-risked by  carrying out demolition and enabling works in a separate standalone package.

 