Weaver Demolition were engaged in early discussions with the client to help develop the sequencing of the demolition works on what was a very logistically challenged site. The client had a requirement to employ a specialist contractor that could deliver a fully integrated strip out, temporary works and demolition package.
Weaver Demolition’s extensive experience in complex demolition projects and our understanding of the challenges of working on a listed building, coupled with our close working relationship with the client, made us the ideal choice for this project.
The client needed to:
The project involved the following stages:
The works were carried out in 12 different phases over a 3 year period.
Upon completion of the project, the client highly valued Weaver Demolition’s cooperation and adaptability in coordinating changes. This large-scale technical refurbishment project required close collaboration between various trades, including groundwork, steelwork, and scaffolding contractors. Weaver Demolition maintained a flexible approach throughout, which benefited the overall scheme and ensured smooth progress.
The key benefits achieved as a result of Weaver Demolition’s involvement in this project include:
Weaver Demolition is proud to have played a key role in this important project, and to help the client meet their objective of creating a world-class performance space. We look forward to continuing to work with the client on future projects.